Need this badly today

What work is done on a level track in bringing the velocity of a train weighing 200metric tons from zero to 45 kph, if the frictional resistance at any velocity is 45N/ton, and if the change in speed is accomplished in length of 1000m? (Ans. 26780.95 KN/m)

C. If the track were a 1% upgrade, what would be the additional work to be done?

Moment Area theorem problem. please help

I've been trying to solve the following question for 2 days now and i can't seem to be able to. can someone help me please ?

For the beam shown in Figure 3, the support at A is fully fixed. The beam is tapered however you may consider it to be a beam of 3 varying sections.

Take:
Beam A to B as having 3 times the I value of beam D to end, Beam B to D as having 1.5 times the I value of beam D to end and Beam D to end is 310 UB 46.2 with I = 100 x 106 mm4. Tip: this may be easier to solve using superposition.