MSTE Refresher Lite Set 7 problem
A furniture manufacturer has two machines, but only one can be used at a time. Machine A is utilized during the first shift and Machine B during the second shift, while both works half of the third shift. If Machine A can do the job in 12 days working two shifts and Machine B can do the job in 15 days working two shifts, how many days will it take to do the job with the current work schedule?
A.14
B.11
C.13
D.9
Sign in with Google to check your answer and see the solution.
Sign in
Similar problems
MSTE Refresher Lite Set 7
A strip of 640 m2 is sold from a triangular field whose sides are 96 m, 72 m, and 80 m. The strip is of uniform width h and has one of its …
MSTE Refresher Lite Set 7
Water evaporates at the rate of two liters per hour per one square meter of surface. How long will it take to evaporate 30 liters of water …
MSTE Refresher Lite Set 7
A disease is known to affect 1 in 10,000 people. It can be fatal, but it is treatable if it is detected early. A screening test for the dis…
MSTE Refresher Lite Set 7
There are four red, three green and five blue discs in a bag. Find the probability that two discs of the same color are drawn.
MSTE Refresher Lite Set 7
Five men and three women are arranged randomly in a row. What is the probability that there are not two women standing together anywhere in…
MSTE Refresher Lite Set 7
The Department of Health encourages elderly people to have a flu vaccination each year. The vaccination reduces the likelihood of getting a…