Basic Algebra Review: Pretest problem
Albert can do a work in 1 hour, Bryan can do it in 2 hours, and Carl can do it in 4 hours. Working together from start, how long can they do the work?
A.0.5455 hr
B.0.5623 hr
C.0.5714 hr
D.0.6175 hr
Sign in with Google to check your answer and see the solution.
Sign in
Similar problems
Basic Algebra Review: Pretest
The sum and product of three distinct positive integers are 15 and 45, respectively. What is the smallest integer?
Basic Algebra Review: Pretest
The sum of thirteen consecutive integers is zero. What is the smallest integer?
Basic Algebra Review: Pretest
X and Y are inversely proportional with each other. Given that X = 15,000 when Y = 162,500. Find X when Y = 328,400.
Basic Algebra Review: Pretest
What is the value of \(x - y\) from the following linear equations?\[3x + 2y = 2\]\[6x - 5y = -32\]
Basic Algebra Review: Pretest
Solve for x2 if 481/x = 4(31/x)
Basic Algebra Review: Pretest
Given the following equations: ab = 1/8 ac = 3 bc = 6 Find the value of b.